Oct. 24-Nov. 1
Work activity
• 4th Street and Hot Springs Boulevard: Crews plan to open the crosswalk on the northeast corner of 4th Street and Hot Springs Boulevard early next week for pedestrian access. The current crosswalk in front of Goodman’s will then close to allow paving operations to continue in the westerly direction. The project team will be working closely with Visit Pagosa to move pedestrian directional signage accordingly.
• Pagosa Springs Middle School: The sidewalk is complete in front of the school. Work continues on additional features (i.e. planters and lighting).
• 3rd Street: The project team is working on the foundations for the pedestrian push buttons at 3rd Street.
Upcoming work
• 5th and Lewis Street: Trenching and installation of conduit will take place. There will be utility work, grading and road base in advance of paving operations between 5th Street and Lewis Street through the end of the month.
• The 4th Street intersection on the north side of U.S. 160 remains closed until utility work and paving are complete.
• Lewis Street and the sculpture garden: Excavation near the Tennyson Sculpture Park and Gardens is continuing for geothermal utilities. Pedestrians need to plan for sidewalk detours around the work at this location for the next few months.
• The Town of Pagosa Springs has several concurrent projects taking place in and near the U.S. 160 work zone. For more information, visit https://www.pagosasprings.co.gov/home-page/page/summer-2025-road-projects.
• Saturday work will continue on the project for the foreseeable future.
Watch where you walk and park
• Pedestrian crosswalks will be open at 1st, 3rd and 4th streets. Mid-block crossings between 4th Street and 5th Street are closed, but the crosswalk at 5th Street will remain open.
• Parking lots are open at 323 Hot Springs Blvd. and 811 San Juan St. Other public parking is available throughout the downtown.
Mountain Express Transit bus stop information
The River Center stop, #18, has moved to 1st Street and U.S. 160 in front of the museum. Bus stop #19, 2nd Street and U.S. 160, has moved to 2nd Street and Lewis Street.
Safety tips for pedestrians
• Watch where you are going. Do not enter the work zone or climb over work zone safety barriers. Construction work may be fascinating, but always prioritize navigating the work zone as safely as you can.
• Pay attention to posted signs in the project area and follow all workers’ instructions. Cross streets only at open crosswalks or intersections; walk on sidewalks whenever they are available.
• Be alert for moving construction vehicles and other unexpected hazards, which often move suddenly and quickly. Stay off your phone when crossing the street or walking near the work zone.
• Look out for traffic before crossing the street make eye contact with drivers so you know they see you.
Safety tips for drivers
• Look out for pedestrians and bicyclists everywhere, at all times, and especially in areas near schools, parks, shopping areas and transit stops.
• Slow down as you approach the work zone. Give workers extra room and be prepared to stop.
• Stop before a crosswalk, not in it.
• Obey all traffic signals. All light signals are operational and must be obeyed.
• Put your cellphone down. Never drive distracted or impaired.
Please be alert when you are traveling through the new traffic configuration or visiting the downtown businesses, as heavy equipment will be frequently moving throughout the project limits.
Traffic impacts
• Motorists could expect up to 15-minute delays at various times through the work zone as equipment may need to be moved.
• There will be two-way traffic flowing in the eastbound lanes of U.S. 160 through the first season of operations.
• A 10-foot width restriction will remain in place 24/7 through Dec. 1.
• During inclement weather, project engineers will assess the roadway and work location to make determinations on work continuing depending on safety concerns for workers and commuters.
• Working hours are Monday through Saturday, 7 a.m. to 6 p.m., and subject to change.
Stay informed and connect with the project
• Call the project information line: (970) 335-9230.
• Email the project team: Pagosa160reconstruction@gmail.com.
• Visit the project website: www.codot.gov/projects/us160pagosasprings.
• Subscribe to project updates: subscription.cotrip.org.