Traffic lights to be repositioned in construction zone Thursday

Posted
On Thursday, April 10, crews will reposition multiple traffic signal lights in downtown Pagosa Springs to accommodate the new lane alignment through the work zone.
 
Work will be performed between 9 a.m. and 3 p.m. at the South 5th Street (Lewis Street) and Hot Springs Boulevard intersections with US 160.

 
The signals will not be operational between 9 a.m. and 3 p.m. Traffic will be guided by flagging personnel through the intersections. Plan for up to 15-minute daytime traffic delays. Slow down and watch for workers